Free Tool
Upload your whole-house generator installation quote and get a clear breakdown of what is included, what may be missing, and what deserves a second look.
Upload My Quote
Drag a file here or click to browse
PDF (text-based), JPG, PNG, WEBP · up to 4 MB
Reviewing a $10,000–$20,000 generator proposal on your own is hard. Two quotes that look similar on paper can have very different scopes. This tool reads your written proposal and gives you a structured review.
Upload your quote
Photo, scan, or PDF — we read the written proposal and extract the key details.
Tell us about your home
ZIP code plus a few optional details let us improve the price and sizing analysis.
Get a structured review
Scope completeness, price context, sizing check, and the questions to ask before signing.
What this tool checks: documented project scope, equipment specifications, installation complexity, and regional market benchmarks. It does not replace a licensed electrician's evaluation, an on-site assessment, or a contractor-licensing review.
It depends entirely on the project scope. A 22 kW natural-gas generator with a 200A automatic transfer switch, full electrical installation, permit handling, site pad, and gas-line work in a mid-cost region can reasonably run $13,000–$17,000. The same generator with a shorter gas run and no panel work might come in lower. The price alone tells you very little — the scope documented in the written proposal is what matters.
The biggest drivers of quote variation are fuel infrastructure (gas-line length and meter upgrades can add $500–$3,000+), electrical work (panel or service upgrades can add $800–$3,000), site access (trenching, concrete cutting, crane access), permit complexity by jurisdiction, and the generator size itself. Two quotes for a '22 kW generator installation' may include completely different scopes — one may include full fuel work and permits while another treats them as owner-responsibility extras.
A thorough written proposal should document: the exact generator model and rated kW, fuel type, transfer switch (amperage and type), all electrical work, fuel line scope and responsibility, generator pad, permit responsibility, startup and commissioning, manufacturer and labor warranty terms, and explicit exclusions. Proposals that leave these items vague or unspecified are common sources of change orders.
It varies by installer. Some include permit fees in the price; others treat them as owner-provided or bill them separately at cost. The important thing is that the quote clearly states who is responsible for obtaining permits and whether their cost is included in the quoted total. Permits for a standby generator installation typically involve an electrical permit and sometimes a gas permit and building permit.
Yes — always. A standby generator must be connected to your home through a transfer switch. The switch automatically disconnects your home from the utility grid when the generator starts, preventing dangerous back-feeding. For whole-home coverage, a full-panel automatic transfer switch (ATS) rated to match your electrical service (typically 200A) is standard. Some installations use load-center-based transfer switches that back up selected circuits instead of the full panel.
A short gas run of 10–25 feet typically adds $400–$900. Longer runs of 50–100 feet can add $1,000–$2,500+ depending on local labor rates, trenching requirements, and whether the existing meter has adequate capacity. If the gas meter requires an upgrade to support the generator's fuel demand, this can add $500–$1,500. A quote that includes a gas line but doesn't specify the length or scope should be clarified before signing.
Yes. Standby generators, especially 22–26 kW units, have significant fuel demands at full load. If the existing gas meter and service line are sized for typical residential appliances only, they may not provide adequate pressure when the generator runs at load, particularly during cold weather or simultaneously with other large gas appliances. A qualified installer should evaluate the existing meter and document in the proposal whether an upgrade is or isn't required.
Yes, for any project in the $10,000–$20,000+ range, getting two or three written proposals is reasonable and common. The goal isn't necessarily to find the cheapest price — it's to compare what each proposal actually includes. A $14,000 quote that documents the full scope is often a better choice than a $12,000 quote that excludes permits, the gas line, and the transfer switch.
There are two separate warranties to confirm: the manufacturer's warranty on the generator unit itself (Generac currently offers 5 years limited on many residential products, but this must be verified for the exact model), and the installer's labor or workmanship warranty covering the quality of the installation work (typically 1–2 years for labor, but it varies widely). Both should be documented in writing in the proposal.